Our Projects
Norwich Cathedral
The fourteen month project encompassed the complete existing lighting system replacement with a new sustainable LED system, remote switching and scene setting. The effects are stunning with all Heritage features illuminated beautifully.
Learn more
Apsley House
The project involved the removal of heating radiators to the Waterloo Gallery, installation of electric heat mats, replacing existing BMS controls, removal of DX coils to existing air handling unit and refurbishment of existing AHU.
Learn more
Wrest Park Country Estate
An amazing project for us to be entrusted with by English Heritage/Historic England, over a ten month period working closely with the client team and in house services to deliver this complete site wide HV/LV sub main upgrade.
Learn more
Winchester Cathedral
The project involved the installation of a new sustainable remote controlled LED lighting system enabling a reduction in cabling containment and access. All commissioning and programming for the project and future adjustment via remote keypad.
Learn more
St Dunstan’s Church
The project involved the upgrading of the complete lighting control system with dimmable LED sustainable luminaires. This encompassed the design, supply of control containment and installation of luminaires, lamps, commissioning and focusing. Risk issues were overcome via access and survey pre-programming.
Learn more
Kenwood House
The project involved the installation of new low level LED escape lighting, specialise LED picture lighting and a disabled lift which included the complete rewiring of the lighting and power in reception and control room areas and the replacement of the existing UPS system.
Learn more
St Anne’s & St Agnes Church
The project involved the installation of a new sustainable LED lighting and control system, complete with all associated electrical works and commissioning services.
Learn more
St John’s College Cambridge
The project involved the installation of a new sustainable LED system within the combination room and adjoining areas. The whole team worked closely to ensure the fabrics and décor were fully protected and that this unique dining room remained fully operational for the college fellows.
Learn more
St Mary’s Church
The project involved the installation of a new sustainable LED lighting & CCTV system throughout the worship areas. All new LED lighting is now controlled via a Lutron dimming control system, this gives multiple scene setting throughout to enable lighting levels to be set as desired, for each service.
Learn more
Kensington Palace
To design, commission, supply and install an energy efficient ventilation system for residential accommodation. The system comprised of energy efficient silent extra low voltage units throughout each residence to achieve the required air changes.
Learn more
Hickeys Chapel
The complete chapel refurbishment of all building services. Inclusive a 'specialist heritage low energy lighting system', electrical infrastructure and complete site-wide redecoration.
Learn more
The Banqueting House
Supply and install for all internal electrical services inside the last surviving building from the Whitehall Palace. The Banqueting House.
Learn more
Whitby Abbey Visitor Centre
Installation of Solar PV system, carrying out design alongside supply and installation for Whitby's Historic Visitor Centre.
Learn more
Dunstanburgh Castle
To design, supply and install a new renewable, sustainable energy efficient off grid power system across Dunstanburgh Castle.
Learn more